mahan sanat
  • About
    • History
    • Representations obtained
    • Strategy
  • Projects
    • Surface Projects
    • Underground Projects
    • Operational Bases
    • Projects on Map
  • Certificates
    • Company Certificates
  • Communication
    • Contact us
    • Company News
منوی اصلی

  • History
  • Representations obtained
  • Strategy

  • Surface Projects
  • Underground Projects
  • Operational Bases
  • Projects on Map

  • Company Certificates

  • Contact us
  • Company News
  • Login
  • Sign up

  • نقشه سایت
  • راهنما
 
English Persian
 
 
Return to list 
Finished Surface Projects

Construction of Access Road and Well Pad for E039N Well – Dalan Gas Field

This project created the required location and access for drilling operations and installation of wellhead facilities to support production increase in Dalan Gas Field. The project was completed on time.

  Contract Type: C
  Contract duration: 6 months
  Employer: Iranian Central Oil Fields Company (ICOFC)
  Location: Fars Province – Farashband – Dalan Gas Field
Share
  •  
  •  
  •  
  •  
Contact Us
comments
 
Reply to:
your title *
comment *

گالری تصاویر
 
برچسب ها
 
#Access Road Construction #Dalan #E039N Well
مطالب مرتبط
 
Procurement of 70 mm Single-Wall Polyethylene Pipes – PN6
Procurement of Single-Wall Polyethylene Pipes – 70 mm (PN6) and 450 mm (PN6)
Procurement and Installation of Wellhead Facilities and Flowline for Wells 11 and 12 – Shanul
Procurement and Construction of 16-Inch Gas Pipeline from Central Collection to Khangiran Metering Station
Procurement and Installation of Guardrails – Dez Dam
Home  |  About Us  |  Contact Us  |  Sitemap
نمادها
ثبت نام در خبر نامه فروشگاه
با دانلود اپلیکیشن همیشه همراهتان هستیم
rashamehrnikan rashamehrnikan

All rights of this site belong to Mahan Sanat Arya®

Home
Projects
0
Certificates
Contact us
جستجو