About
History
Representations obtained
Strategy
Projects
Surface Projects
Underground Projects
Operational Bases
Projects on Map
Certificates
Company Certificates
Communication
Contact us
Company News
منوی اصلی
About
History
Representations obtained
Strategy
Projects
Surface Projects
Underground Projects
Operational Bases
Projects on Map
Certificates
Company Certificates
Communication
Contact us
Company News
Login
Sign up
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
Our projects on map
replacement of gas pipeline network with Maron as additional EPC activities (EPC)
Full implementation of landscaping and construction of sandy car parking of Foley barracks Abad Ahvaz (C)
Supply of on-off Valves 18 to 34 inch valves (P)
Completion of Gore crude oil storage tanks by EPC method, strategic tanks construction plan Crude oil (EPC)
adding two turbo compressors in the gas and liquefied gas factory 700 and 800 (EPC)
Buy 4 Casing Pipes 9-5/8" & 30" , LINER 5" TUBING 4-1/2" needed by drilling department (P)
Drilling and completion of 2 wells and removal of suspension and completion of 4 wells Suspended well with tamben items for 4 repair wells in the form of EPDS, Azadegan oil field (EPDS)
supply of goods, types of drill bits, 27 rings of drilling fields, Ahvaz project 2.3 5 ()
purchase of single-wall polyethylene pipe with a diameter of 70 mm PN6 (P)
purchase of single-walled polyethylene pipe with a diameter of 70 mm PN6 and purchase of single-walled polyethylene pipe with a diameter of 450 mm - pn6 (P)
Procurement of equipment and construction of wellhead facilities and flowlines for wells No. 11 and 12 in the Shanul field. (PC)
Construction of alternative facilities due to Upper Dam/collection of well facilities and pipelines Submergence of alternative pipelines (PC)
Preparation and installation of guardrail fences (PC)
procurement of equipment and construction of wellhead facilities and flowlines for wells D1 and D2 in the Khangiran field. (PC)
Procurement of equipment and construction of wellhead facilities and flowlines for wells No. 8 in the Shanul field. (PC)
Provision of goods and installation of well facilities and construction of flow pipeline for 52 wells and 53 Najjiran (PC)
Purchasing and installing valves and fittings on the light gas route of the factory outlet Gas and liquefied gas 1600 (EPC)
Construction of access road and location of E053S Meydan Nazgiran (C)
Construction of site and access road to the well, location E039N Meydan Dalan (C)
buy 12 flow pipes for 10 oil and gas wells ( Shirin Service) (P)
Provision of goods and installation of well facilities and construction of flow pipeline of wells) E113S Kangan along with the supply of goods for well facilities and flow pipelines for three other wells (PC)
Provision of goods and installation of well facilities and construction of flow pipeline of the well) E127N Tabnak (PC)
Construction of 12 inch Rosminy pipeline in the new corridor of Mahshahr Bakhshi city From the project 081308 (PC)
Purchasing and replacing a number of gas and liquefied gas plant valves 1000 (EPC)
Home
Projects
0
Certificates
Contact us
جستجو