Completion of Gore crude oil storage tanks by EPC method, strategic tanks construction plan Crude oil 1401/11/01
Full implementation of landscaping and construction of sandy car parking of Foley barracks Abad Ahvaz 1401/07/16
Construction of 12 inch Rosminy pipeline in the new corridor of Mahshahr Bakhshi city From the project 081308 07/10/95
Provision of goods and installation of well facilities and construction of flow pipeline of the well) E127N Tabnak 10/1/92
Provision of goods and installation of well facilities and construction of flow pipeline of wells) E113S Kangan along with the supply of goods for well facilities and flow pipelines for three other wells 90/6/26
Purchasing and installing valves and fittings on the light gas route of the factory outlet Gas and liquefied gas 1600 01/26/97
Provision of goods and installation of well facilities and construction of flow pipeline for 52 wells and 53 Najjiran 87/5/6
Procurement of equipment and construction of wellhead facilities and flowlines for wells No. 8 in the Shanul field. 85/7/20
procurement of equipment and construction of wellhead facilities and flowlines for wells D1 and D2 in the Khangiran field. 87/2/22
Construction of alternative facilities due to Upper Dam/collection of well facilities and pipelines Submergence of alternative pipelines 88/9/21
Procurement of equipment and construction of wellhead facilities and flowlines for wells No. 11 and 12 in the Shanul field. 89/4/7
purchase of single-walled polyethylene pipe with a diameter of 70 mm PN6 and purchase of single-walled polyethylene pipe with a diameter of 450 mm - pn6 1398