mahan sanat
  • About
    • History
    • Representations obtained
    • Strategy
  • Projects
    • Surface Projects
    • Underground Projects
    • Operational Bases
    • Projects on Map
  • Certificates
    • Company Certificates
  • Communication
    • Contact us
    • Company News
منوی اصلی

  • History
  • Representations obtained
  • Strategy

  • Surface Projects
  • Underground Projects
  • Operational Bases
  • Projects on Map

  • Company Certificates

  • Contact us
  • Company News
  • Login
  • Sign up

  • نقشه سایت
  • راهنما
 
English Persian
 
 
Return to list 
Current Surface Projects

Replacement of Maroon Associated Gas Transmission Pipeline Network

This project is part of the flare gas recovery master plan. The implementation included the integration of flare gas from Maroon operational units 6, 1, 4, 3, and 5, and connecting the gas transmission pipeline from NGL-500 to NGL-400 as per the schedule.
Gas transfer from NGL-500 to NGL-400 was executed by crossing the Jarrahi River through detailed engineering and technical works.
This project is part of the rehabilitation plan and involves construction of facilities to recover flare gases. The new pipeline network spans over 60 km, crossing the Jarrahi and Kupal Rivers, and operational stations such as Maroon 6 and 1, supplying feed gas to NGL-400 from NGL-500.
With the successful execution, the project prevented the flaring of 90 million standard cubic feet of gas per day at Maroon 6, 1, and NGL-500, which was previously untransferable due to pipeline deterioration.

  Contract Type: EPC
  Contract duration: 24 months
  Employer: Maroon Petrochemical Company
  Location: Operational Area of Maroon Oil & Gas Production Company, Khuzestan Province
Share
  •  
  •  
  •  
  •  
Contact Us
comments
 
Reply to:
your title *
comment *

برچسب ها
 
#Replacement of Gas Transmission Network #Maroon Associated Gas #Flare Gas #
مطالب مرتبط
 
Construction of Crude Oil Strategic Storage Tanks in Goreh via EPC Method
Installation of Two Turbo Compressors to Existing Turbo Compressors at Gas and NGL Plants 700 and 800
Completion of remaining works for flowline replacement of wells, construction of wellhead facilities for Well No. 9 at Gavarzin Gas Field, and gas transfer to Hengam Gas Processing Facilities
Home  |  About Us  |  Contact Us  |  Sitemap
نمادها
ثبت نام در خبر نامه فروشگاه

To contact us, please send messages to your e info@mysite.com. We will reply as soon as possible.

با دانلود اپلیکیشن همیشه همراهتان هستیم
rashamehrnikan rashamehrnikan

All rights of this site belong to Mahan Sanat Arya®

Home
Projects
0
Certificates
Contact us
جستجو