Finished Surface Projects
Construction of Access Road and Well Pad for Location E021 – Khangiran Gas Field
This project was undertaken to provide a drilling site and access road for ICOFC operations at location E021 in the Khangiran Gas Field. The successful and timely execution supported increased production capacity.
|
Contract Type: C |
|
Contract duration: 6 months |
|
Employer: Iranian Central Oil Fields Company (ICOFC) |
|
Location: Khorasan Razavi Province – Sarakhs – Khangiran Gas Field |