Finished Surface Projects
Procurement and Construction of 16-Inch Gas Pipeline from Central Collection to Khangiran Metering Station
This project aimed to increase the production capacity of the Khangiran Gas Field and to support winter gas supply and industrial fuel requirements.
|
Contract Type: PC |
|
Contract duration: 12 months |
|
Employer: Iranian Central Oil Fields Company (ICOFC) |
|
Location: Khorasan Razavi Province – Sarakhs – Khangiran Gas Field |